PROCEDURE FOR THE PROJECT

(Method of Statement-Work Procedure)

  1. Instruction to proceed with the job.
  2. Survey the area and remark areas.
  3. Get the final Approved Construction Drawing.
  4. Permission to commencement for the work.
  5. Preparing initial civit up to ground works.
  6. Erection approved schedule.
  7. Wielding to make ready & by Cutting 6 Bending approved schedule
  8. Installation, Fixing 6 positioning works.
  9. Fixing as per Drawing.
  10. Roofing system.
  11. Electrical wearing 6 connection.
  12. MEP works.
  13. Handed over to completion.
  14. Demobilization.